Happy Eid Adha to all muslims around the world. I and our CEO cannot ‘Balik Kampung’ as we need to finish our urgent SCS project for KL South and Tengku Jaafar Power Station.
Dec
8
I and our engineerzz (Bok) managed to setup and install LANTIME/M300/MRS NTP server. Bok created the radical design of antenna holder and installed the new antenna with new coax wire. the old one totally kaput.
we finished at 6 pm.
thanks for cooperation from TNB guys who really passion on waiting us for perfecting our job.