Jan 13

New PO means new project gonna coming very soon. Thanks ALLAH.

Jan 13

Our SAT ‘tokey’ is working very hard to solve all problems related to new extension job for Olak Lampit 275kV/123kV job. hopefully we can finish by this week.

Jan 26

JMobile Sdn. Bhd. crews wishe happy chinese new year to our customers.

Jan 13

I with our scada consultant (Mas Safari) went to Tmn U, Tg. Bin and Yong Peng for site visit  to find out and report any problem related to TNB SAT 230 & SAT 250 system.

Last night i managed to complete the report and submitted to Siemens for further action.

Hopefully TNB will get back to us ASAP.

2009 really bring us up.

Jan 13

Alhamdulillah, our scada wizard with team managed to rectify and solve all jobs related to extension project for TJGS (Tuanku Jaafar Gas Station) at Port Dickson.

After almost 1 month at Port Dickson. we feel like we are PD resident. maybe need to find a house there. hehehee

Dec 8
Happy Eid Adha
icon1 admin | icon2 Uncategorized | icon4 12 8th, 2008| icon31 Comment »

Happy Eid Adha to all muslims around the world. I and our CEO cannot ‘Balik Kampung’ as we need to finish our urgent SCS project for KL South and Tengku Jaafar Power Station.

Dec 8

I and our engineerzz (Bok) managed to setup and install LANTIME/M300/MRS NTP server.  Bok created the radical design of antenna holder and installed the new antenna with new coax wire. the old one totally kaput.

we finished at 6 pm.

thanks for cooperation from TNB guys who really passion on waiting us for perfecting our job.

Nov 25

We managed to picked up LANTIME/M300/MRS NTP Server from TNT warehouse 2:30 pm today.

Puan Farah has confirmed that we are going to install the new NTP server at Kapar Substation tomorrow (26/11/2008). hopefully everything will be very fast and as expected.

Thanks for TNT for fast delivery (economical rate shipment in just 3 days) and Mr. Kastam for making the clearance very fast.

Nov 8
New Job to Replace and Configure GPS Device
icon1 admin | icon2 Uncategorized | icon4 11 8th, 2008| icon3Comments Off

We managed to get TNB contract to replace and configure Meinberg GPS NTP server for Kapar Station. The Meinberg GPS will be arrived on 26th of November 2008.


Key Features :

  • Synchronization of NTP and SNTP compatible clients
  • Web based status and configuration interface (Demo) and console based graphical configuration utility
  • Supported networking protocols: IPv4, IPv6, HTTPS, HTTP, SSH, TELNET, SCP, SFTP, FTP, SYSLOG, SNMP
  • Alert-Notification system of status change by Email, WinMail, SNMP or an external connected display
  • Full SNMP v1,v2,v3 support with own SNMP-daemon for status and configuration and SNMP Trap messages
  • USB port for performing updates, lock front panel, and backup/restore configuration and log files.
  • Two independant RJ-45 ethernet interfaces 10/100 MBit
Oct 24

SAT 230 SCS Screenshot at Kapar 500 KV

Close Up of Running SAT 230 SCS during Diagnostic Session